What is the overall construction schedule for this project?

Construction is currently scheduled to begin in the spring of 2024, and be completed in the fall of 2026. Construction in 2024 will include the main sewer line along West Lakeshore Drive, the force main along Blakely Road to pump the sewer to the Town’s existing sewer system at Severance Corners, and the main pumping stations along this corridor.  Construction in 2025 will include the service laterals along West Lakeshore Drive, as well as the main sewer line and all service laterals along East Lakeshore Drive. Construction in 2026 will include the sewer main and service laterals on Goodsell Point.

Show All Answers

1. What is the Malletts Bay Sewer Project?
2. Where would the wastewater be treated?
3. How will the project be funded?
4. Is my property located in the new sewer service area?
5. Will properties within the sewer service area be required to connect to the sewer system?
6. How much will the initial connection fees be for properties connected to the sewer system?
7. What will the annual cost be for a residential property within the proposed sewer service area?
8. What will the annual cost be for a non-residential property within the proposed service area?
9. Many of the properties within the sewer service area are significantly lower than the roadway, how will these properties be connected?
10. What is the overall construction schedule for this project?
11. What is the current overall status of the project?
12. How can I get additional information about the project?