SlideShow

  • The second coat is scratched or scarified
  • Small amounts are placed on a working table
  • Sand, gypsum lime and water are mixed
  • Here we can see the final coat applied to the area
  • Hawks are loaded to present the plaster
  • Walls & ceiling - since 1927
  • Note the difference in texture and appearance
  • Drying time 1st coat
  • Approximately 5 tons of plaster applied
  • A

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to Schoolhouse Restoration - 3 Coats of Plaster photos