A culvert beneath Middle Road, which channels water across the road, has struggled to manage water flow and has caused flooding in the past. This project aims to eliminate these issues by replacing the old culvert with a larger concrete structure that can handle increased water volumes, thus preventing flooding and erosion along the roadway.